top of page

CEKA Parking Garage Construction Starts March 2021

Writer: Virgin Islands Port AuthorityVirgin Islands Port Authority

Updated: Jan 28, 2021

The Virgin Islands Port Authority will begin the construction of a new, multi-level Parking Transportation Center at the Cyril E. King Airport on St. Thomas in March 2021. The new parking garage will provide over 600 parking spaces and a designated area for all taxis and rental car agencies. During the construction period, there will be very limited parking space at the Cyril E. King Airport. Residents are encouraged to arrange being dropped off and picked up at the airport terminal when traveling.




The Port Authority will provide more details about this project before it begins. For more information about the expansion of the Cyril E. King Airport, visit the Port Authority’s website at www.viport.com or call the Authority’s Public Information Office at (340) 774-1629.

 
 
 

Kommentare


Die Kommentarfunktion wurde abgeschaltet.
Post: Blog2 Post

Address

St. Thomas/St. John

8074 Lindbergh Bay, St. Thomas VI  00802 

P.O. Box 301707, St. Thomas, VI 00803 - Mailing

St. Croix

Henry E. Rohlsen Airport Terminal,

Estate Manning Bay, Christiansted, St. Croix, VI 00821

P.O. Box 1134, St. Croix, VI  00820 - Mailing

Administrative Office Hours

Mon - Fri: 8 am -  5pm
​​Saturday and Sunday: Closed
Closed all federal and local holidays

Contact

Telephone: 1-340-774-1629    St. Thomas

Telephone: 1-340-774-2975    St. John

Telephone: 1-340-778-1012    St. Croix


info@viport.com

  • Facebook
  • X
  • LinkedIn
  • Instagram
  • YouTube
  • TikTok

Subscribe to Stay Informed... 

Thank you for your interest.

©2024 by the Virgin Islands Port Authority

bottom of page